You can edit, activate, or delete an integration flow schedule.

Set an integration flow schedule first. Only Integration administrators have access.

To manage an integration flow:

  1. Select an integration flow.
  2. From the inspector on the right, select the Schedule tab.
  3. Select ... (the ellipsis).
  4. Select Edit, Activate or Delete.
    • Edit: To revise the schedule settings, see Schedule an integration flow.
    • Activate: The status changes to ACTIVE and a success message displays.
    • Delete: When you delete an integration schedule, you lose the integration schedule name and all of its settings. 
The dropdown to edit, activate or delete an integration flow schedule.