You can edit, activate, or delete an integration flow schedule.
Set an integration flow schedule first. Only Integration administrators have access.
To manage an integration flow:
- Select an integration flow.
- From the inspector on the right, select the Schedule tab.
- Select ... (the ellipsis).
- Select Edit, Activate or Delete.
- Edit: To revise the schedule settings, see Schedule an integration flow.
- Activate: The status changes to ACTIVE and a success message displays.
- Delete: When you delete an integration schedule, you lose the integration schedule name and all of its settings.