Create a schedule to set or repeat specific times for your integration run.
You must have a connection and integration created.
To create an integration schedule:
- Select an integration from the list.
- Select the Schedule tab on the right panel.
- Select Create schedule.
- Complete the dialog entries:
- Enter the Schedule name (limited to 128 letters, hyphens, underscores, or spaces).
- Time Zone (select from dropdown).
- Trigger frequency (select from dropdown).
- If you choose hourly:
- Set the hours in the Repeat every dropdown.
- Set the Start time.
- Set the End time (this determines when the integration run no longer repeats).
- If you choose hourly:
- Set the Days of week (Monday through Sunday).
- Enter the Start Date.
- Enter the End Date (end date must be after the start date).

- Click Save.
Other dropdowns display based on the interval you select as your Trigger frequency. If you select Weekly, you must specify the Days of the week, Start date, and End date, for example.
Note that we don't run scheduled CloudWorks integrations during platform maintenance windows (usually on Saturdays from 1:00–5:00 p.m. PDT). Reschedule your integrations or run them manually once the platform maintenance is complete.